The EHS Techniques team has conducted an LDAR campaign in a biomethane plant operated in Spain under real operating conditions to evaluate the plant’s performance, identify fugitive emissions and analyze its environmental impacts, safety and odor generation. Objective of the LDAR tests The main objective of the tests was to verify the tightness of equipment,[…]
EHS Techniques’ soils team participated in a technical training day at a Plenergy service station on December 11, focusing on the particularities of this type of installation and its direct impact on soil characterization work. During the session, operational criteria were reviewed, common service station scenarios were analyzed and practical approaches were shared to improve[…]
EHS Techniques provides technical assistance services for obtaining and maintaining the social license to operate in numerous biomethane plant projects driven by some of the country’s leading developers. Through a framework contract, we continuously accompany the projects requested by the client, adapting to their different phases and territorial needs. Scope of the study The scope[…]
YPF developed the NEC 10 PPM FEED phase Project to comply with the feul environmental requirements for its complexes in Luján de Cuyo (Mendoza), La Plata (Buenos Aires) and Plaza Huincul (Neuquen). In order to obtain its subsequent environmental permits and obtain financing from the World Bank, EHS Techniques prepared the Social and Environmental Impact[…]
EHS Techniques has advised a well-known Project Management firm in conjunction with an investment fund to perform the due diligence audit of the environmental liabilities that this acquisition could generate. In addition, an environmental taxonomy compliance and major adverse impact (PAI) analysis was performed, which included modeling with the CRREM model of the decarbonization of[…]
EHS Techniques has advised a well-known investment firm with the due diligence audit of the environmental liabilities that such acquisition could generate. The residential projects ranged from land to be built, others already under construction and some already completed and even in operation. Our reports were also used in the financing process of the operation[…]
Within the framework of an environmental assessment study for the implementation of a photovoltaic plant in the province of Malaga, an annual cycle survey of avifauna, bats and key species is carried out in order to identify the species present in the area, assess the impacts on them and propose moderating and corrective measures to[…]
Within the framework of an environmental assessment study for the implementation of a photovoltaic plant in the province of Alicante, an annual cycle survey of avifauna, bats and key species is carried out in order to identify the species present in the area, assess the impacts on them and propose moderating and corrective measures to[…]
Within the framework of an environmental assessment study, a survey of the Iberian desman (Galemys pyrenaica) was carried out to verify whether the species is present in the study area and to propose corrective measures. Project scope The study focused on: Methodology EHS Techniques applied a species-specific survey protocol in accordance with Spanish and EU[…]
Prior to the repair work on the Martín Gil Viaduct, which crosses the Ricobayo reservoir, species that could nest or seek refuge in the infrastructure itself and in adjacent areas that could be affected by the work were identified. After identifying these species, corrective measures were proposed to make the presence of these species in[…]