EHS Techniques has advised a well-known investment firm with the due diligence audit of the environmental liabilities that such acquisition could generate. The residential projects ranged from land to be built, others already under construction and some already completed and even in operation. Our reports were also used in the financing process of the operation[…]
Within the framework of an environmental assessment study for the implementation of a photovoltaic plant in the province of Malaga, an annual cycle survey of avifauna, bats and key species is carried out in order to identify the species present in the area, assess the impacts on them and propose moderating and corrective measures to[…]
Within the framework of an environmental assessment study for the implementation of a photovoltaic plant in the province of Alicante, an annual cycle survey of avifauna, bats and key species is carried out in order to identify the species present in the area, assess the impacts on them and propose moderating and corrective measures to[…]
Within the framework of an environmental assessment study, a survey of the Iberian desman (Galemys pyrenaica) was carried out to verify whether the species is present in the study area and to propose corrective measures. Project scope The study focused on: Methodology EHS Techniques applied a species-specific survey protocol in accordance with Spanish and EU[…]
Prior to the repair work on the Martín Gil Viaduct, which crosses the Ricobayo reservoir, species that could nest or seek refuge in the infrastructure itself and in adjacent areas that could be affected by the work were identified. After identifying these species, corrective measures were proposed to make the presence of these species in[…]
EHS Techniques has a network of territorial social engagement experts throughout the Spanish territory. This figure enables close engagement with the agents of the territory, promoting the legitimacy of the project and active listening to them. These actions allow us to work towards the social license to operate (LSO) of the projects and their advantageous[…]
EHS Techniques was contracted by a multinational engineering and construction company to estimate fugitive emissions from new units at a chemical plant in Turkey for the production of purified PTA. Reference average emission factors were used after an analysis of the P&IDs. The study included the inventory of each possible source of leakage using an[…]
EHS Techniques carried out a wide emissions study to detect and measure emissions from vents, fugitive and from unburned methane in the Natural Gas sector. EHS Techniques carried out a wide emissions study to detect and measure emissions from vents, fugitive and from unburned methane in the Natural Gas sector. Different technologies were used, including[…]
The product LCA is an internationally standardized methodology (ISO 14040), which allows calculating the environmental impact of a product through several indicators (Carbon Footprint, terrestrial and aquatic ecotoxicity, acidification and aquatic eutrophication etc …). EHS Techniques carried out LCA studies for products as diverse as packaging, industrial rubbers, chemicals, photovoltaic panels, wind towers … always[…]
EHS Techniques was commissioned by one of the most important energy companies in the state, awardee of some 625 MW in the REER auction held in January 2021, to draft the strategic plan with estimates of the impact on local employment and the industrial value chain of 7 wind and photovoltaic parks. The Plan was[…]